IFTBC emblem
Innova FoodTechBusiness Consultancy
Let's Talk

Pricing

Clear Fees for Every Stage of Your Project

Take one stage or the complete journey, from first feasibility study to commercial production.

Please note: these are our standard fees for food projects in Nepal. Your final fee is confirmed in a written proposal based on your product and project.

Stage by Stage

Pay Only for the Stages You Need

Each stage has a clear scope, set deliverables and a defined payment structure.

  1. 1

    Feasibility & Business Plan

    Feasibility study, local market analysis, financial model and a bank-ready DPR.

    • Detailed Project Report with 5-year projections
    • Capex, Opex, IRR and break-even analysis
    • Go-to-market strategy
    • Packaging and brand strategy

    NPR 250,000 to 450,000

    Fixed fee

    50% upfront, 50% on delivery

    Enquire about this stage
  2. 2

    R&D & Recipe Industrialization

    Recipe scaling, product stabilization, shelf-life testing setup and sensory panels.

    • Commercial recipe dossier for production-size batches
    • Target quality ranges for each product
    • Processing parameters
    • Shelf-life validation reports

    NPR 300,000 to 600,000

    Retainer or milestone

    Milestone payments

    Enquire about this stage
  3. 3

    Plant Layout & Machinery Sourcing

    CAD factory layout, equipment sizing and vendor negotiations.

    • 3D and 2D factory layout plans
    • Machinery procurement specification sheet
    • Electrical, boiler and water treatment estimates
    • GMP and HACCP zoning

    NPR 500,000 to 900,000

    Fixed fee

    Paid in three parts: 30%, 40%, 30%

    Enquire about this stage
  4. 4

    DFTQC Compliance & Regulatory

    DFTQC plant licensing, labeling compliance, and ISO 22000 and HACCP documentation.

    • DFTQC licensing documentation and filing assistance
    • Labeling compliance audit
    • HACCP and FSMS manuals
    • SOPs, critical control points and sanitation schedules

    NPR 200,000 to 350,000

    Total for this stage

    Paid in equal monthly instalments

    Enquire about this stage
  5. 5

    Plant Commissioning & Trial Runs

    On-site trial batches, SOP implementation, CIP protocols and operator training.

    • Validation across three consecutive commercial runs
    • SOP implementation on site
    • Clean-In-Place protocols
    • Staff training manuals

    NPR 25,000 to 40,000

    Per day on site

    On-site daily rate

    Enquire about this stage

Fee Estimator

Estimate Your Project

Select the stages you need. This gives a rough guide only and is not a quotation.

Stages

Estimated Consultancy Fee

NPR 550,000 to 1,050,000

2 of 5 stages selected

Request a Proposal

Good to Know

Not Included in These Fees

  • Third-party laboratory testing, such as microbiology, heavy metals and nutrition panels
  • Travel and lodging outside Kathmandu Valley
  • Government and regulatory registration fees
  • Machinery, construction and other project costs

Third-party costs are billed at actual cost.

Questions

Common Questions

Why are the fees shown as a range?

The fee depends on the scope of your project. We confirm the exact amount in a written proposal before work begins.

Can I take just one stage?

Yes. Each stage is priced on its own, so you can start with what you need now.

Do these fees apply to every food type?

Yes, these are our standard fees across food types. The exact amount depends on your product and scope, and we confirm it in a written proposal.

Do you guarantee licences and certificates?

No. We prepare you and your documents. Licences are decided by government agencies, and certificates by independent certification bodies.

Ready to Plan Your Project?

Tell us what you want to build and we will prepare a proposal for your project.

WhatsApp